(5-3) Cell / Battery installed/contained in equipment resp. with connection to the equipment (e.g. clicked to it or linked via cables)
6. Mode of transport:
(6-2) Sea as per IMDG code
Are you interested in our flat rate packages?
As an alternative option to the one-time download of a single checklist for a fee, you may choose one of our Download Flatrate Packages. Click on the package option you wish to learn more about.